
Cantilever Rack in Minneapolis Midwest Division.
Pipe, lumber, tube, and sheet goods need arms, not beams. NAWL's Minneapolis Midwest Division ships cantilever bases, columns, and arms to Twin Cities warehouses at wholesale pricing — no six-week mill wait, no install markup.
Midwest Division
Our Minneapolis division serves the Twin Cities and the Upper Midwest — cantilever is the lead product line.
Long-Load Engineering
Arm capacity, deflection, and base depth spec'd to your actual load and reach before you buy.
Dealer Pricing
Wholesale tiers for material-handling dealers and contractors across Minnesota.
Single or Double Sided
Wall runs or open-aisle double-sided rows, straight or inclined arms.
Freight & Lead Times.
- Division
- Minneapolis (Midwest)
- Coverage
- Twin Cities + Upper Midwest
- Typical transit
- 1–3 days
- Lead time
- Quick-ship stock sizes
Questions.
Do you ship cantilever rack to Minneapolis and St. Paul?
Yes. Cantilever bases, columns, and arms ship to Twin Cities docks from our Minneapolis Midwest Division at wholesale pricing — no 6–8 week mill schedule and no turnkey installer markup.
What loads does cantilever rack handle?
Cantilever is built for long or awkward loads that won't sit on a pallet — pipe, tube, lumber, sheet goods, extrusions, and steel bar. Arm capacity and deflection are published per column and arm length.
Do you install cantilever rack in the Twin Cities?
No. NAWL is a wholesale supplier. We ship the system with drawings and capacity charts; your crew or a local installer sets it. That's how we keep the material price below turnkey suppliers.
Single-sided or double-sided?
Both. Single-sided runs against a wall, double-sided down an open aisle for roughly twice the storage per foot of floor. We spec the right base depth for your load and reach.
Local Guides.
Cantilever Racking in Minneapolis
What Minneapolis warehouses spec for pipe, lumber, and long stock.
Read guide →Cantilever Racking in St. Paul
Arm capacity and layout guidance for St. Paul shops and yards.
Read guide →Choosing Frame Height
Matching upright height to ceiling clear, sprinklers, and lift reach.
Read guide →